Organization Name:
(组织名称)
Macro Solutions
Organizational Unit:
(组织单位)
Services and Development Projects
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jun 15, 2018
Lead Appraiser:
(主任评估师)
Cynthia Torpey
Sponsor:
(发起人)
Peter Boyer , Todd Barnes
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Location does not significantly impact the range of conditions in which processes must operate. Regardless of location, projects are tailored to meet the type of work and the methodology chosen.)
Customer (Not Relevant: The customer does not significantly impact the range of conditions in which processes must operate. Macro selects processes based on the type of work and the methodology chosen.)
Size (Not Relevant: Size does not significantly impact the range of conditions in which processes must operate. Regardless of size, Macro will select processes which best fit the type of work and the methodology required.)
Organizational Structure (Not Relevant: Org Structure does not significantly impact the range of conditions in which processes must operate. The processes selected do not vary based on the organizational structure. All PMs report to the COO and the processes are based on the type of work and the methodology chosen.)
Type of Work: Type of Work varies between the Development projects and the Services projects in the application of processes
Methodology: Methodology is a significant factor in how work is performed at Macro. Agile and Waterfall projects vary significantly.
Sampling Factor Values: Services (Type of Work): Projects that primarily focus on delivery of services
Development (Type of Work): Projects that primarily focus on the delivery of a product
Agile (Methodology): Projects that use Agile methods
Waterfall (Methodology): Projects that follow a waterfall lifecycle.
Subgroups: Agile Development: Projects that use Agile methods to develop systems
8 People, 1 Basic Units
– Development
– Agile
Agile Services: Projects that use Agile methods to deliver services
20 People, 1 Basic Units
– Agile
– Services
Waterfall Development: Projects that use the waterfall lifecycle to develop systems
36 People, 2 Basic Units
– Development
– Waterfall
Waterfall Services: Projects that use the waterfall lifecycle to deliver services
17 People, 2 Basic Units
– Waterfall
– Services