Organization Name:
(组织名称) Mirle Automation Corporation
(组织名称) Mirle Automation Corporation
Organizational Unit:
(组织单位) FAMA Division (FAMA)
(组织单位) FAMA Division (FAMA)
Maturity Level:
(成熟度) Maturity Level 2
(成熟度) Maturity Level 2
Appraisal End Date:
(评估结束日期) Jan 12, 2018
(评估结束日期) Jan 12, 2018
Lead Appraiser:
(主任评估师) Po-Ching (Antoine) Chuang
(主任评估师) Po-Ching (Antoine) Chuang
Sponsor:
(发起人) Wayne LIAO
(发起人) Wayne LIAO
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: The OU to be appraised is located in Hsinchu only)
Customer (Not Relevant: Taiwan water company and Metro type projects are excluded in this appraisal)
Size: Large > 30 Man Month ; Small <= 30=”” man=””>
Organizational Structure (Not Relevant: FAMA Division is the only only division under appraised)
Type of Work (Not Relevant: Development is the only work type)Sampling Factor Values: Large (Size): More than 30 Man Month
small (Size): Less than or equal 30 Man MonthSubgroups: SG 1: Hsinchu, Water Treatment, Large
13 People, 3 Basic Units
– Large
SG 2: Hsinchu, Water Treatment, Small
10 People, 4 Basic Units
– small
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。
