Nanjing Rail-2018-Sig Technology Co., Ltd.-2018-CMMI3

CMMI认证查询 cmmirz 3年前 (2018-02-01) 138次浏览 0个评论
Organization Name:
(组织名称)
Nanjing Rail-Sig Technology Co., Ltd.
Organizational Unit:
(组织单位)
Development Department
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Feb 02, 2018
Lead Appraiser:
(主任评估师)
Hasan Syed Niaz
Sponsor:
(发起人)
Yuan Ren
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Only one location exists for the Development Department so there is no impact on where the projects are developed. All processes are applied at this location. [Not Relevant])
Customer (Not Relevant: The type of customer does not impact the way work is performed for any type of customer. All processes are implemented accordingly in a similar fashion for any customer. [Not Relevant.])
Size (Not Relevant: All processes are implemented at organizational unit level. All processes remain applicable regardless of size as such aggregate size (FTE/PTE) of each project is around seven staff members. These processes do not differentiate project because of their size. [Not Relevant.])
Organizational Structure (Not Relevant: Development Department is where all the projects are developed. Standardized processes are used accordingly so org structure does not impact the way work is performed. [Not Relevant])
Type of Work: Two types of work. (1) Training and Simulation Platforms (Platform) type emphasize on the extensive use cases, testing, public safety and user interfaces. (2) Applications System (ApSys) type of work emphasizes on the requirement, technical solutions, data analysis, interfaces design and user requirements and usage of data for real time analysis and monitoring. [Relevant]
Sampling Factor Values: ApSys (Type of Work): Applications System (ApSys) type of work emphasizes on the requirement, technical solutions, data analysis, interfaces design and user requirements and usage of data for real time analysis and monitoring.
Platform (Type of Work): Training and Simulation Platforms (Platform) type emphasize on the extensive use cases, testing, public safety and user interfaces regardless of size of FTEs/PTEs.
Subgroups: ApSys: Applications System (ApSys) type of work emphasizes on the requirement, technical solutions, data analysis, interfaces design and user requirements and usage of data for real time analysis and monitoring.
7 People, 1 Basic Units
– ApSys
Platform: Training and Simulation Platforms (Platform) type emphasize on the extensive use cases, testing, public safety and user interfaces regardless of size of FTEs/PTEs.
14 People, 2 Basic Units
– Platform

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Nanjing Rail-2018-Sig Technology Co., Ltd.-2018-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址