NAVAL Group-CMMI2

CMMI认证查询 cmmirz 3个月前 (12-05) 48次浏览 0个评论
Organization Name:
(组织名称)
NAVAL Group
Organizational Unit:
(组织单位)
FTI Program : Intermediate Size Frigates
Maturity Level:
(成熟度)
Maturity Level 2
Appraisal End Date:
(评估结束日期)
Dec 06, 2019
Lead Appraiser:
(主任评估师)
Jean-Yves Guilbaud
Sponsor:
(发起人)
Olivier de la Bourdonnaye , Laurent ESPINASSE , Sylvain PERRIER
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The FTI program work is distributed across several locations in France: the main one is Lorient ; other locations are Ollioules, Ruelle and Indret. All these locations follow the standard NAVAL Group method assets and do not significantly impact the way work is performed and managed. Nevertheless, practitioners from all locations will be interviewed.)
Customer (Not Relevant: There is one customer for the program.)
Size (Not Relevant: All maturity level 2 practices were defined as relevant and applicable, irrelevant of program package or work package size.)
Organizational Structure (Not Relevant: Organizational structures provide resources for the FTI program and do not significantly impact the way level 2 practices are done. Practices are rather influenced by the standard NAVAL Group method and by the FTI program”s management rules.)
Type of Work (Not Relevant: There is no specific notion of type of work applicable to this program, other than the main phase in the lifecycle, which applies to all work packages in the WBS.)
Level of WBS: As defined in the NAVAL Group standard management method (BMS), practices vary depending on the level in the program”s WBS: Program Direction level (level 1) called DDP, Program Package level (level 2) called LP and Work Package level (level 3) called WP. Project management practices vary depending on the level managed.
Sampling Factor Values: DDP (level 1) (Level of WBS): Program Direction (DDP): staff and activities dedicated to managing the program”s global integrated plans
LP (level 2) (Level of WBS): Program Packages (LP): staff and activities dedicated to managing sets of Work Packages under the hierarchy of a Program Package (LP)
WP (level 3) (Level of WBS): Work Packages (WP): work packages at the lowest level of the WBS
Subgroups: Program Direction (DDP): Program Direction (DDP): staff and activities dedicated to managing the program”s global integrated plans
18 People, 1 Basic Units
– DDP (level 1)
Program Packages (LP): Program Packages (LP): staff and activities dedicated to managing sets of Work Packages under the hierarchy of a Program Package (LP)
56 People, 8 Basic Units
– LP (level 2)
Work Packages (WP): Work Packages (WP): work packages at the lowest level of the WBS
455 People, 115 Basic Units
– WP (level 3)