BNP PARIBAS Leasing Solutions-2014-CMMI2

CMMI认证查询 cmmirz 7年前 (2014-11-27) 264次浏览 0个评论
Organization Name:
(组织名称)
BNP PARIBAS Leasing Solutions
Organizational Unit:
(组织单位)
IT Corp - Software development projects
Maturity Level:
(成熟度)
Maturity Level 2
Appraisal End Date:
(评估结束日期)
Nov 28, 2014
Lead Appraiser:
(主任评估师)
Yohan Bourgoin
Sponsor:
(发起人)
SOPHIE ROBERT
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: There is no specific development or way of working according to location (the 2 sites use the same processes).)
Customer (Not Relevant: There is no specific development or way of working according to customer)
Size (Not Relevant: 2 types of project exists (small project < 200=”” m.d=”” &=”” project=””> 200 m.d) but there are no tailoring for the moment except regarding the minimum number of QA reviews during the project).)
Organizational Structure (Not Relevant: There is no specific development or way of working according to organizational structure (all domains work in the same way).)
Type of Work: There are two types of software development technologies in BNPP LS that impacts way of working of projects: • AS400 (scope of the previous SCAMPI A and main legacy technology of the entity) • Other technologies (e.g. Java, Pearl, .Net, Datastage)
Project Organization: Projects could be performed in the frame of a program or not. In this case, some activities could be done at program level (e.g. planning, reporting).
Project life-cycle: For new technology, BNPP LS teams usually work according to a standard lifecycle but a new project work with AGILE approach and SCRUM method.
Sampling Factor Values: AS400 (Type of Work): AS400 technology development.
Other technos (Type of Work): New technologies (in opposite to AS400) like Java, Pearl, .Net, Datastage…
Linked to a program (Project Organization): The project is done under a master program.
Not linked to a program (Project Organization): The project is not under a master program (independant).
Standard (Project life-cycle): The project is performed with a standard V life-cycle.
Agile (Project life-cycle): The project is performed with an Agile approach and Scrum method.
Subgroups: Agile: Projects in Agile way of working
10 People, 1 Basic Units
– Other technos
– Not linked to a program
– Agile
AS400-NP: AS400 projects not linked to a program
28 People, 7 Basic Units
– Standard
– Not linked to a program
– AS400
AS400-P: AS400 projects linked to a program
19 People, 7 Basic Units
– AS400
– Linked to a program
– Standard
OtherTechnos-NP: Other than AS400 projects not linked to a program
37 People, 5 Basic Units
– Standard
– Not linked to a program
– Other technos
OtherTechnos-P: Other than AS400 projects linked to a program
33 People, 5 Basic Units
– Other technos
– Linked to a program
– Standard

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:BNP PARIBAS Leasing Solutions-2014-CMMI2
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址