Control Point Corporation-2016-CMMI3

CMMI认证查询 cmmirz 10年前 (2016-07-26) 553次浏览 0个评论
Organization Name:
(组织名称)
Control Point Corporation
Organizational Unit:
(组织单位)
Project Management, Engineering, and Operations Group
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jul 27, 2016
Lead Appraiser:
(主任评估师)
Jeanie Kitson
Sponsor:
(发起人)
Paul Stowell
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Employees from all CPC sites use the same processes that are audited for adherence by the same Mission Assurance group.)
Customer (Not Relevant: The approach to the way in which work is done is not dependent upon the customer.)
Size (Not Relevant: All candidate projects are at the same or similar staffing levels)
Organizational Structure (Not Relevant: One organizational structure across all sites)
Type of Work: Systems work (tasks, order of steps, etc.)is done differently than software development.
Sampling Factor Values: Software Development (Type of Work): Primary output of this work is software and software related artifacts/documentation.
Systems (Type of Work): Primary output of this work is the development of systems engineering documents (e.g., SSS/SSDD/System Engineering Plans, etc.)
Subgroups: Software Development: Primary output of this subgroup is software and software related artifacts/documentation.
18 People, 3 Basic Units
– Software Development
Systems: Primary output of this subgroup is the development of systems engineering documents (e.g., SSS/SSDD/System Engineering Plans, etc.)
15 People, 4 Basic Units
– Systems

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Control Point Corporation-2016-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址