Shenyang Poscard Information Technology Co., Ltd.-2014-CMMI3

CMMI认证查询 cmmirz 12年前 (2014-11-27) 655次浏览 0个评论
Organization Name:
(组织名称)
Shenyang Poscard Information Technology Co., Ltd.
Organizational Unit:
(组织单位)
R&D Center
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Nov 28, 2014
Lead Appraiser:
(主任评估师)
Hongwei Liu
Sponsor:
(发起人)
Xuening Yang
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: All projects are in the same location)
Customer (Not Relevant: Not Relevant. There are no significant different between projects for different customers)
Size (Not Relevant: Not Relevant: There are no notable difference among projects with different size (The process implemented in this organization is far more affected by other factors such as requirement uncertainty than project size).)
Organizational Structure (Not Relevant: Not Relevant:The organization has a unified structure and the same development process is implemented in the organization.)
Type of Work: Relevant: There are two type of methodologies, waterfall and prototype
Sampling Factor Values: waterfall (Type of Work): projects use waterfall methodology
prototype (Type of Work): projects use prototype methodology
Subgroups: sg_wf: subgroup that uses waterfall methodology.
42 People, 2 Basic Units
– waterfall
sg_prot: subgroup that uses prototype methodology
23 People, 2 Basic Units
– prototype

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shenyang Poscard Information Technology Co., Ltd.-2014-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址