Organization Name:
(组织名称) Rural Servicios Informáticos (RSI)
(组织名称) Rural Servicios Informáticos (RSI)
Organizational Unit:
(组织单位) All projects (Full Life Cycle and Agile) and Talleres (Reduce Life Cycle) and Microtalleres (Micro-Reduce Life Cycle), for all technologies
(组织单位) All projects (Full Life Cycle and Agile) and Talleres (Reduce Life Cycle) and Microtalleres (Micro-Reduce Life Cycle), for all technologies
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Nov 30, 2017
(评估结束日期) Nov 30, 2017
Lead Appraiser:
(主任评估师) Jose Sancho Thomas
(主任评估师) Jose Sancho Thomas
Sponsor:
(发起人) Carlos Cervero del Pozo
(发起人) Carlos Cervero del Pozo
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: All projects are managed from the same location, Tres Cantos site in Madrid (Spain).)
Customer (Not Relevant: All RSI projects are developed from their offices so they are able to use their methodology. Sometimes the client ask to use theirs, but in this cases the PMO allows that only when it covers all the main points and if not the projects need to do a delta to cover with their methodology. That’s why we did not consider customer as a relevant sampling factor.)
Size: Three types of project based on size (Project, Taller, Micro Taller.
Organizational Structure (Not Relevant: Organizational structure is not a relevant factor because is an organizational policy to use the same methodology to standardize the way all the organization works.)
Type of Work (Not Relevant: There is only one type of work software development)
Technology: Two types of projects based on Technological Platform (Mainframe and Web developments).Sampling Factor Values: Project (Size): Projects with an estimated effort of 100 or more person / days
Taller (Size): Projects with an estimated effort between 30 and 100 or more person / days
Micro Taller (Size): Projects with an estimated effort of less than 30 person / days
Mainframe (Technology): Projects developed for mainframe technologies.
Web (Technology): Projects developed for Web technologies.Subgroups: Mainframe Full Life Cycle: Projects developed for mainframe technologies with an estimated effort of 100 or more person / days
97 People, 28 Basic Units
– Project
– Mainframe
Mainframe Reduced Life Cycle: Projects developed for mainframe technologies with an estimated effort between 100 and 30 person / days
52 People, 25 Basic Units
– Mainframe
– Taller
Mainframe Micro-Reduced Life Cycle: Projects developed for mainframe technologies with an estimated effort of less than 30 person / days
23 People, 26 Basic Units
– Mainframe
– Micro Taller
Web Full Life Cycle: Projects developed for Web or Client/Server technologies with an estimated effort of 100 or more person / days
92 People, 23 Basic Units
– Web
– Project
Web Reduced Life Cycle: Projects developed for Web or Client/Server technologies with an estimated effort between 100 and 30 person / days
60 People, 32 Basic Units
– Taller
– Web
Web Micro-Reduced Life Cycle: Projects developed for Web or Client/Server technologies with an estimated effort of less than 30 person / days
29 People, 24 Basic Units
– Web
– Micro Taller