Organization Name:
(组织名称) SFO Technologies Pvt. Ltd. , NEST TECHNOLOGIES CORP.
(组织名称) SFO Technologies Pvt. Ltd. , NEST TECHNOLOGIES CORP.
Organizational Unit:
(组织单位) Software Development Projects executed jointly by NEST TECHNOLOGIES CORP. and SFO Technologies Pvt. Ltd.
(组织单位) Software Development Projects executed jointly by NEST TECHNOLOGIES CORP. and SFO Technologies Pvt. Ltd.
Maturity Level:
(成熟度) Maturity Level 5
(成熟度) Maturity Level 5
Appraisal End Date:
(评估结束日期) Apr 29, 2017
(评估结束日期) Apr 29, 2017
Lead Appraiser:
(主任评估师) Rajarshi Kumar Das
(主任评估师) Rajarshi Kumar Das
Sponsor:
(发起人) Javad K Hassan , Nazneen Jehangir
(发起人) Javad K Hassan , Nazneen Jehangir
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: All projects are executed jointly at single locations in India and the USA)
Customer (Not Relevant: Customers have never specified any particular process requirements. Thus, both organizations follow the same global QMS, being part of the same group of companies; this is irrespective of who the customer is.)
Size (Not Relevant: There are different size measures being used depending on the type of lifecycle being followed in the project – the process differences have been considered in the sampling factor ‘Type of Work’ Within a project lifecycle group there is no impact of size on the process to be followed. Hence, all projects follow the same process irrespective of size.)
Organizational Structure (Not Relevant: This is one group across the two organizations where all follow the same process)
Type of Work: There is a differentiation based on the lifecycle being followed – Agile and Waterfall. Also, while most projects are micro controller based there have been power controller based waterfall projects which require changes in the engineering process to be followed.Sampling Factor Values: Agile (Type of Work): Project following an Agile life cycle
Waterfall (Type of Work): Project following a Waterfall life cycle
Waterfall_Power (Type of Work): Waterfall project that is power controller basedSubgroups: Agile: Project following an Agile life cycle
38 People, 2 Basic Units
– Agile
Waterfall: Project following a Waterfall life cycle
22 People, 4 Basic Units
– Waterfall
Waterfall_Power: Power controller based project following a waterfall life cycle
6 People, 1 Basic Units
– Waterfall_Power