Shaanxi Jiazhiyi Network Technology Co., Ltd.-2020-CMMI3

CMMI认证查询 cmmirz 5年前 (2020-01-21) 483次浏览 0个评论
Organization Name:
(组织名称)
Shaanxi Jiazhiyi Network Technology Co., Ltd.
Organizational Unit:
(组织单位)
Technical Department
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jan 22, 2020
Lead Appraiser:
(主任评估师)
Deepak Manjarekar
Sponsor:
(发起人)
GUO ZHISHENG
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The scope of appraisal is Technical Department of Shanxi Jiazhiyi located at Xi’an. No other location is considered. Shanxi Jiazhiyi QMS processes are established at organizational level for Xi’an Location. So “LOCATION” factor is not considered for project selection.)
Customer (Not Relevant: Technical Department executes software development projects for their client and users of digital product trading and sales platform. In all the basic units, standard process defined at organization level with minor tailoring is followed. No significant changes observed in the processes followed by these projects for different customers. So ‘CUSTOMER’ factor is not considered for project selection.)
Size (Not Relevant: Technical Department QMS processes does not vary and differentiating for different size of the projects. All projects are of typically similar staff size (06-08 staff) with similar duration. There is no variation in the work performed in these projects due to project team size and hence all projects are required to follow same processes irrespective of project team size. So “SIZE” factor is not considered for project selection.)
Organizational Structure (Not Relevant: Organizational Structure is same for all the software development projects executed in Technical Department hence no significant process variation based on organizational structure. So ‘ORGANIZATIONAL STRUCTURE’ factor is not considered for the project selection. Following functions / activities are carried out at organizational Level. 1. EPG 2. PPQA 3. Training)
Type of Work (Not Relevant: Technical Department executes software development projects using the Waterfall Life Cycle. Same sets of processes are followed for execution of these projects. So ‘TYPE OF WORK’ factor is not considered for project selection.)
Life Cycle: All Projects follow Waterfall Life Cycle. Though Life Cycle factor does not have any impact, ‘LIFE CYCLE’ factor is considered for project selection.
Sampling Factor Values: Waterfall Life Cycle (Life Cycle): Projects which follows Waterfall life cycle for project execution
No Life Cycle (Life Cycle): –
Subgroups: Waterfall Life Cycle: Projects which follows Waterfall life cycle for project execution
14 People, 2 Basic Units
– Waterfall Life Cycle

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Shaanxi Jiazhiyi Network Technology Co., Ltd.-2020-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址