Indra Sistemas S.A.-2014-CMMI5

CMMI认证查询 cmmirz 7年前 (2014-12-17) 341次浏览 0个评论
Organization Name:
(组织名称)
Indra Sistemas S.A.
Organizational Unit:
(组织单位)
• ATM European Programs • International ATM Projects • CES Leon
Maturity Level:
(成熟度)
Maturity Level 5
Appraisal End Date:
(评估结束日期)
Dec 18, 2014
Lead Appraiser:
(主任评估师)
Jose Luis Iparraguirre
Sponsor:
(发起人)
Hosain Badouch , Jose Luis Chinchilla Garcia , JOSE LUIS GONZALEZ PAZ
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All the units considered in the scope of the project are based on the same location, using the same office facilities: Torrejon large size ATM developments and León in house ATM developed products)
Customer: The concept customer leads the segmentation of processes affecting large programs based on the impact of the customer process’s and life cycles in the project-defined process
Size (Not Relevant: Size is irrelevant being all the projects of similar sizes, and developed following the same processes and life cycle)
Organizational Structure (Not Relevant: Structure is common for all the units, having a Unit Manager, a set of Program Managers, depending on the number of contracts alive, one Project Manager per project. Engineering activities are carried out by horizontal support teams)
Type of Work: The type of work, evolution roadmap of existing ATM products, turnkey ATM solutions and large ATM programs, results in different approaches in terms of the associated, quality and productivity, baselines
Sampling Factor Values: ENAIRE (Customer): Spanish Air Traffic Control Body
NATS (Customer): UK Air Traffic Control Body
EUROCONTROL (Customer): inter-European air traffic management Body
DFS (Customer): German Air Traffic Control Body
ROMATSA (Customer): Romanian Air Traffic Control Body
Large Programs Customer Specific (Type of Work): Long Term Programs for developing ATM solutions specific for a particular customer.
Turnkey ATM solutions (Type of Work): Development of systems for customers requesting a an ATM solution
Internal Product Roadmap (Type of Work): Roadmap of ATM components developed by CES Leon
Subgroups: 1. LPCS. EN: Program for building major versions of the existing air traffic management system at ENAIRE, Spanish Air Traffic Control Body
26 People, 2 Basic Units
– ENAIRE
– Large Programs Customer Specific
2. LPCS. EU: Program for building a new inter-European air traffic management system for EUROCONTROL
11 People, 1 Basic Units
– Large Programs Customer Specific
– EUROCONTROL
3. LPCS. DF: Program for building a new air traffic management system for the German Air Traffic Control Body
44 People, 3 Basic Units
– DFS
– Large Programs Customer Specific
4. LPCS. RO: Program for building a new air traffic management system for the Romanian Air Traffic Control Body, subjected to the Eurocontrol specifications
3 People, 2 Basic Units
– Large Programs Customer Specific
– ROMATSA
5. LPCS .NA: Program for building a new air traffic management system for the UK Air Traffic Control Body
9 People, 2 Basic Units
– NATS
– Large Programs Customer Specific
6. TKATMS: Projects for developing turnkey ATM solutions, integrating in-house developed products and other COTS
15 People, 3 Basic Units
– Turnkey ATM solutions
7. CES LEON.IPR: Program for implementing the roadmap of the in-house developed products in support of the ATM market
7 People, 3 Basic Units
– Internal Product Roadmap

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Indra Sistemas S.A.-2014-CMMI5
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址