Marlabs Software (P) Ltd.-2015-CMMI5

CMMI认证查询 cmmirz 11年前 (2015-01-15) 665次浏览 0个评论
Organization Name:
(组织名称)
Marlabs Software (P) Ltd.
Organizational Unit:
(组织单位)
Software Development Projects
Maturity Level:
(成熟度)
Maturity Level 5
Appraisal End Date:
(评估结束日期)
Jan 16, 2015
Lead Appraiser:
(主任评估师)
Mangesh Katalkar
Sponsor:
(发起人)
Raghavan Anil
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Two locations but the same set of standard processes are being used across locations. Work is not performed differently across different locations. This has no bearing on process execution.)
Customer (Not Relevant: Work is not performed differently depending on the customer served by that work. Set of standard processes being used does not differ based on customer. This has no bearing on process execution.)
Size (Not Relevant: Work is not performed differently depending on the size of the project. Projects are of medium size that ranges from 5 to 15 persons. Set of standard processes being used does not differ based on size. This has no bearing on process execution.)
Organizational Structure (Not Relevant: One division as depicted on an organization chart. This has no bearing on process execution.)
Type of Work (Not Relevant: Work is not performed differently based on the type of work. Type of work includes Software Development work. This has no bearing on process execution.)
Lifecycle Model: Work is performed differently based on the lifecycle model i.e. Waterfall Lifecycle Model, Iterative and Incremental Lifecycle Model, Iterative Lifecycle Model. Process areas affected are Project Management and Engineering process areas.
Sampling Factor Values: Waterfall Lifecycle Model (Lifecycle Model): The project proceeds according to clearly defined phases; a proceeding phase must be completed before the next starts. In sequence of stages the output of each stage becomes the input for the next stage after the review. There is no overlap between phases and the end of each phase a review process review takes place to determine if the project is on the right path and whether or not to continue.
Iterative and Incremental Lifecycle Model (Lifecycle Model): The project is divided into sub projects/modules each of which is an iteration that results in an increment. Each iteration passes through the requirements, design, implementation and testing phases. Each subsequent release of the system adds function to the previous release, until all designed functionality has been implemented.
Iterative Lifecycle Model (Lifecycle Model): The project is divided into sub projects/modules each of which is an iteration in parallel. Each iteration passes through the requirements, design, implementation and testing phases. A working version of software is produced during the completion of the iteration with longest duration.
Subgroups: SG1: Software Development projects executed using Waterfall Lifecycle Model
8 People, 1 Basic Units
– Waterfall Lifecycle Model
SG2: Software Development projects executed using Iterative and Incremental Lifecycle Model
24 People, 3 Basic Units
– Iterative and Incremental Lifecycle Model
SG3: Software Development projects executed using Iterative Lifecycle Model
14 People, 1 Basic Units
– Iterative Lifecycle Model

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Marlabs Software (P) Ltd.-2015-CMMI5
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址