Locksmith Software Technologies-2014-CMMI3

CMMI认证查询 cmmirz 12年前 (2014-04-29) 677次浏览 0个评论
Organization Name:
(组织名称)
Locksmith Software Technologies
Organizational Unit:
(组织单位)
Software Engineering Division
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Apr 30, 2014
Lead Appraiser:
(主任评估师)
Rajendra Khare
Sponsor:
(发起人)
Mehmet Serdar Kasirga
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: Location has no impact on process implementation because there is only one location of (Locksmith Software Technologies, Software Engineering Division, Ankara, Turkey) The environment at the client site is also similar.)
Customer (Not Relevant: Not Relevant: As organization is providing services in similar domain and similar processes are applied. All customers are Corporate or Government Agencies and well-defined requirements based application development is carried out adequately suitable for waterfall model is followed in all the projects.)
Size (Not Relevant: Not Relevant: Size has no impact on process implementation because all the projects are of similar size and Software Development Lifecycle is followed according to Locksmith processes. For project categorization, standard tailoring guidelines are followed which contain variation of organization standard processes.)
Organizational Structure (Not Relevant: Not Relevant: All projects are under the same structure (Organizational Unit) called (Software Engineering Division). Within the projects, as well, the structure is similar containing project manager / project lead, team-members, etc.)
Type of Work: Two types of Software Development activity are carried out: (1) Development Projects (2) Maintenance Projects. Where ever required Standard processes are tailored to prepare the project defined process.
Sampling Factor Values: Development Projects (Type of Work): New application development using standard processes with customer requirements.
Maintenance Projects (Type of Work): Software Maintenance project which are built on existing system with enhanced customer requirements and change requests.
Subgroups: New Development: New application development using standard processes with tailoring and customer requirements.
17 People, 2 Basic Units
– Development Projects
Software Maintenance: Software Maintenance project which are built on existing system with enhanced customer requirements and change requests.
5 People, 1 Basic Units
– Maintenance Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Locksmith Software Technologies-2014-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址