Organization Name:
(组织名称) Shenzhen StepWell Environmental Protection Technology Co., Ltd.
(组织名称) Shenzhen StepWell Environmental Protection Technology Co., Ltd.
Organizational Unit:
(组织单位) Intelligence Environmental Protection Department
(组织单位) Intelligence Environmental Protection Department
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Aug 27, 2016
(评估结束日期) Aug 27, 2016
Lead Appraiser:
(主任评估师) Deepak Manjarekar
(主任评估师) Deepak Manjarekar
Sponsor:
(发起人) Chen Xin
(发起人) Chen Xin
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: The scope of appraisal is Shenzhen location. No other location is considered. Shenzhen StepWell QMS processes are established at organizational level for Shenzhen Location, so “LOCATION” factor is not considered for project selection.)
Customer (Not Relevant: The Shenzhen StepWell QMS processes does not vary and differentiating for different customer. So “CUSTOMER” factor is not considered for project selection.)
Size (Not Relevant: The Shenzhen StepWell QMS processes does not vary and differentiating for different size of the projects. So “SIZE” factor is not considered for project selection.)
Organizational Structure (Not Relevant: Organizational Structure is same for all the software development projects hence no significant process variation based on organizational structure. So ‘ORGANIZATIONAL STRUCTURE’ factor is not considered for the project selection. Following functions / activities are carried out at organizational Level. 1. Engineering Process Group (EPG) 2. Quality Assurance (QA) 3. Training)
Type of Work (Not Relevant: The Shenzhen StepWell executes software development projects which are executed using the Waterfall Life Cycle. Same sets of processes are followed for execution of these projects. So ‘TYPE OF WORK’ factor is not considered for project selection.)
Life Cycle: All Projects follow Waterfall Life Cycle. At present both projects are following Waterfall life cycle. Though Life Cycle factor does not have any impact, ‘LIFE CYCLE’ factor is considered for project selection.Sampling Factor Values: Waterfall Life Cycle (Life Cycle): Projects with Normal SDLC process execution
No Life Cycle (Life Cycle): –Subgroups: Waterfall Life Cycle: Projects with Normal SDLC process execution
10 People, 2 Basic Units
– Waterfall Life Cycle
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。