Organization Name:
(组织名称)
Beijing Xuji Electric Co., Ltd.
Organizational Unit:
(组织单位)
System Development Dept., Information Engineer Dept. and Consult Engineer Dept.
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Mar 11, 2015
Lead Appraiser:
(主任评估师)
Steven Hu
Sponsor:
(发起人)
Jinzhu Zhong
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The factor is determined as not affected, because all active projects are located in Beijing.)
Customer (Not Relevant: The factor is determined as not affected, because all projects were performed for State Grid Group Internal Customer.)
Size (Not Relevant: The factor is determined as not affected, because all active projects are in Medium class. (The size is class as : A. Small – less than 15 person months; B.Medium – Between 15 to 100 person months; C.Large – Larger than 100 person months))
Organizational Structure: A.System Development Dept. B.Information Engineer Dept. C.Consult Engineer Dept.
Type of Work (Not Relevant: The factor is determined as not affected, because all projects were software development projects.)
Application domains: A) Electric power B) SAP ERP
Project Types: A) New development B) Customization
Sampling Factor Values: System Development Dept (Organizational Structure): State grid group information product that were developed in System Development Dept.
Information Engineer Dept (Organizational Structure): State grid group information projects that were conducted by information engineer dept.
Consult Engineer Dept (Organizational Structure): State grid group internal EPR projects that were conducted by Consult Engineer Dept.
Electric power (Application domains): Projects develop the Electric power industry management information systems for State Grid Group.
SAP ERP (Application domains): Projects develop and implement the SAP ERP system for State Grid Group Internal Customer. The ERP developing project follows the development guide of ASAP. The processes of RD, TS, PI, VER, REQM and CM will differ.
New development (Project Types): The projects develop new software system.
Customization (Project Types): The projects customize the system for customer basing on existed products or platforms. The processes of RD, TS, PI and VER will differ.
Subgroups: SG 1: New development projects for Electric power in System Development Dept.
6 People, 2 Basic Units
– System Development Dept
– Electric power
– New development
SG 2: Customization projects for Electric power in Information Engineer Dept.
11 People, 2 Basic Units
– Customization
– Electric power
– Information Engineer Dept
SG 3: SAP ERP customization projects in Consult Engineer Dept.
14 People, 3 Basic Units
– Consult Engineer Dept
– SAP ERP
– Customization

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Beijing Xuji Electric Co., Ltd.-2015-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址