(组织名称) Zhejiang Post & Telecommunication Construction Co., Ltd
(组织单位) Institute of Science and Technology
(成熟度) Maturity Level 3
(评估结束日期) Sep 20, 2020
(主任评估师) Lester Stamnas
(发起人) Jianqiang Qiu
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Not Relevant: All Basic Units within the Org unit perform their task at Hangzhou city site. As such, there are not differences in implementation in terms of location.) Customer (Not Relevant: Not relevant: Government customers only. Since this is a government owned company, all software is for the government as its sole customer. Internal (P3) means internal to the government owned entity. External (P1 & P2) is outside the government owned entity for other government customers and does not affect the way the projects implement the processes.)
Size (Not Relevant: Not Relevant: All projects are between 6 and 25 man-months. The size difference is minimal and does not affect the way the projects implement the processes.)
Organizational Structure (Not Relevant: Not Relevant: All the basic units and support functions fit within the same organizational department: Institute of Science & Technology)
Type of Work: There are two types of work:
New Development: Basically, new software development, consisting of the full life cycle, with standard tailoring options
Maintenance Dev: This is for software maintenance consisting of standard life cycle pre-tailored: use existing requirements and design documents and trace matrix and add product mods to them, combines high-level design and low-level design together as well as integration and system test activities.Sampling Factor Values: New Development (Type of Work): new software development, consisting of the full life cycle, with standard tailoring options Maintenance (Type of Work): This is for software maintenance consisting of standard life cycle pre-tailored: use existing requirements and design documents and trace matrix and add product mods to them, combines high-level design and low-level design together as well as integration and system test activities.
Subgroups: New Development: From planning to completion, the system is completely adopting a new development model in a waterfall lifecycle.
53 People, 4 Basic Units
– New DevelopmentMaintenance: use existing requirements and design documents and trace matrix and add product mods to them, combines high-level design and low-level design together as well as integration and system test activities.
20 People, 2 Basic Units
– Maintenance