(组织名称) CECT BVERI Corporation Limited
(组织单位) R&D Department of Energy Saving and Environmental Protection
(成熟度) Maturity Level 3
(评估结束日期) Jun 20, 2020
(主任评估师) Yuanqiang Cao
(发起人) Junkang Liu
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: OU is only located in Beijing.) Customer (Not Relevant: The OU provides products and services in same application domain and the customer is from external.)
Size (Not Relevant: Currently, all projects in OU are all medium size ones.)
Organizational Structure (Not Relevant: All projects are within the OU. No difference in way of projects are performed regardless of what department of organization.)
Type of Work: (1) Upgrade;
(2) New Developed.Sampling Factor Values: Upgrade (Type of Work): The project is an upgrade project based on the original product, and the system architecture adopts the original architecture. New Developed (Type of Work): The project is a new deveoloped project based on the original product, and the new system architecture needs to carry out feasibility study first.
Subgroups: Upgrade Projects (SG1): The project is an upgrade project based on the original product, and the system architecture adopts the original architecture.
18 People, 2 Basic Units
– UpgradeNew Developed Projects(SG2): The project is a new deveoloped project based on the original product, and the new system architecture needs to carry out feasibility study first.
27 People, 3 Basic Units
– New Developed
