Organization Name:
(组织名称) China Everbright Bank
(组织名称) China Everbright Bank
Organizational Unit:
(组织单位) Critical System Engineering
(组织单位) Critical System Engineering
Maturity Level:
(成熟度) Maturity Level 4
(成熟度) Maturity Level 4
Appraisal End Date:
(评估结束日期) Nov 20, 2015
(评估结束日期) Nov 20, 2015
Lead Appraiser:
(主任评估师) Rajendra Khare
(主任评估师) Rajendra Khare
Sponsor:
(发起人) fan li
(发起人) fan li
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Location has no impact on process implementation because none of the processes are location-specific. All critical systems are developed in house in Beijing. Everbright Bank Standard process methodology is followed.)
Customer (Not Relevant: The major customers are business units within Everbright Bank.)
Size: Projects are divided in two different size of Projects Type A (Project effort between 36-180 man-months) Type B (Project effort greater than 180 man-months). Different type of projects applies software development process with different process composition and tailoring.
Organizational Structure (Not Relevant: All projects are under the same structure (Organizational Unit) called (Critical System Engineering). Within the projects, as well, the structure is similar containing program manager, project manager / project lead, team-members, etc.)
Type of Work (Not Relevant: Critical system upgrade, enhancement and advancement are carried out as per standard processes and are tailored to prepare the project defined process.)Sampling Factor Values: Type A (Size): Project effort between 36-180 man-months
Type B (Size): Project effort greater than 180 man-monthsSubgroups: Project Type A: Critical system update, enhancement or advance project with the effort between 36-180 man-months.
68 People, 4 Basic Units
– Type A
Project Type B: Critical system upgrade, enhancement and advance projects with the efforts greater than 180 man month.
165 People, 8 Basic Units
– Type B
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。