Organization Name:
(组织名称) everis Spain, S.L.U.
(组织名称) everis Spain, S.L.U.
Organizational Unit:
(组织单位) everis Centers Group
(组织单位) everis Centers Group
Maturity Level:
(成熟度) Maturity Level 5
(成熟度) Maturity Level 5
Appraisal End Date:
(评估结束日期) Mar 12, 2020
(评估结束日期) Mar 12, 2020
Lead Appraiser:
(主任评估师) Giuseppe Satriani
(主任评估师) Giuseppe Satriani
Sponsor:
(发起人) FERNANDO EUSEBIO FERNANDEZ
(发起人) FERNANDO EUSEBIO FERNANDEZ
-
Sampling Summary:
(抽样汇总) -
Sampling Factors: Location: even though every center uses the same tools and methodology, the sponsor asks for explicitly mention every center under the appraisal scope, consequently location has been considered relevant. The inclusion of this factor as a relevant factor is a guarantee that the sample contains a representative number of BUs belonging to all the centers
Customer (Not Relevant: Not relevant because a customer that work with Everis Centers must accept the standard working protocol established by Everis Centers. For this reason there is always established an adaptation period in which both parties refine the operational topics. At the end of this phase, the customer becomes “everis Centers compatible customer”))
Size (Not Relevant: Within the type of work included in the appraisal scope, there are slight differences depending on size that are considered no relevant for segmentation and managed as tailoring within the methodology))
Organizational Structure (Not Relevant: This factor is one-to-one correspondent to Location, consequently it has been considered not relevant because the segmentation is guaranteed by Location))
Type of Work: Within the appraisal scope there are significant differences depending on the type of work: DF+DT+CO, DT+CO, COdesdeDTSampling Factor Values: Lisbon (Location): Center located in Lisbon, Portugal
Salamanca (Location): Center located in Salamanca, Spain
Tetuán (Location): Center located in Tetuán, Morocco
DF+DT+CO (Type of Work): Requests of Work (RoW) that include the development of Functional Specification, Functional and Technical Design Coding and Testing
DT+CO (Type of Work): Requests of Work (RoW) that include the development of Functional and Technical Design, Coding and Testing
COdesdeDT (Type of Work): Requests of Work (RoW) that include the development of Coding and Testing starting from a technical designSubgroups:
LIS-COdesdeDT: BUs executed in Lisbon Center that have in input the technical design and that include only the coding and testing phases
32 People, 4 Basic Units
– Lisbon
– COdesdeDT
SAL-DF+DT+CO: BUs executed in Salamanca Center that have in input users requirements and that include development of Functional Design (FD), Technical Design (TD), Coding (CO) and Testing
132 People, 3 Basic Units
– DF+DT+CO
– Salamanca
SAL-DT+CO: BUs executed in Salamanca Center that includes the development of Technical Design (DT), coding (CO) and testing
90 People, 4 Basic Units
– Salamanca
– DT+CO
SAL-COdesdeDT: BUs executed in Salamanca Center that have in input the technical design and that include only the coding and testing phases
115 People, 6 Basic Units
– COdesdeDT
– Salamanca
TET-DT+CO: BUs executed in Tetuán Center that have in input the functional specs and that include the development of Technical Design (DT), coding (CO) and testing phases
66 People, 5 Basic Units
– Tetuán
– DT+CO
TET-COdesdeDT: BUs executed in Tetuán Center that have in input the technical design and that include only the coding and testing phases
44 People, 6 Basic Units
– COdesdeDT
– Tetuán
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。
