hiberus Tecnología-2017-CMMI2

CMMI认证查询 cmmirz 8年前 (2017-09-28) 684次浏览 0个评论
Organization Name:
(组织名称)
hiberus Tecnología
Organizational Unit:
(组织单位)
HDO - AMS Service Unit
Maturity Level:
(成熟度)
Maturity Level 2
Appraisal End Date:
(评估结束日期)
Sep 29, 2017
Lead Appraiser:
(主任评估师)
Giuseppe Satriani
Sponsor:
(发起人)
Santiago Jose Sanchez Lopez
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Organizational Unit is located in one place – Zaragoza/Spain.)
Customer: There are two different types of Customers: AST (the local government agency) and OTHERS (the rest of AMS projects)
Size: The organization way of work makes a different between small and big types of works. Big is considered when a request overcome 100 p/h effort
Organizational Structure (Not Relevant: The OU (HDO-AMS Service Unit) is a small unit, without significant differences between AST AMS and OTHER AMS)
Type of Work: The organization way of work makes a difference between type of works with an high development impact (UMA) and those closer to a support/ticketing type of work
Sampling Factor Values: AST (Customer): Service lines related to AST contract
OTHERS (Customer): Service lines related to other customers that are not AST
BIG (Size): Request of work that overcome 100 p/h of effort
SMALL (Size): Request of work under or equal to 100 p/h of effort
UMA (Type of Work): Request of work that are managed as a development project
SUPPORT (Type of Work): Request of work that are managed as a ticket
Subgroups: AST-BIG-UMA: Request of work belonging to AST customer, greater than 100p/d of effort and with an high development impact
6 People, 1 Basic Units
– AST
– BIG
– UMA
AST-SMALL-UMA: Request of work belonging to AST customer, minor than 100p/d of effort and with an high development impact
4 People, 1 Basic Units
– UMA
– SMALL
– AST
AST-SMALL-SUPPORT: Request of work belonging to AST customer, minor than 100p/d of effort, with a low development impact
8 People, 3 Basic Units
– AST
– SMALL
– SUPPORT
OTHERS-UMA-BIG: Request of work belonging to customers that are not AST, greater than 100p/d of effort and with an high development impact
2 People, 1 Basic Units
– UMA
– BIG
– OTHERS
OTHERS-UMA-SMALL: Request of work belonging to customers that are not AST, minor than 100p/d of effort and with an high development impact
1 People, 1 Basic Units
– OTHERS
– SMALL
– UMA

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:hiberus Tecnología-2017-CMMI2
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址