(组织名称) JIANG SU XING HU TECHNOLOGY CO.,LTD
(组织单位) Software Development Department
(成熟度) Maturity Level 3
(评估结束日期) Jun 29, 2020
(主任评估师) Dixie Dice
(发起人) Wancheng You
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: All development work is conducted in the Nanjing offices.) Customer (Not Relevant: One project is a petrochemical industry customer, three projects have a fire industry customer, one project has a community customer. There are not changes in the process based on customer.)
Size (Not Relevant: All projects are between 5 and 8 man-months and have 4 people. The size difference is minimal and does not affect the way the projects implement the processes. The duration of the projects are 5-6 months. The range is not significant in how the projects perform the processes.)
Organizational Structure (Not Relevant: All projects come from Software Development Department.)
Type of Work (Not Relevant: All projects are software development of products using full range of appropriate organizations processes.)
Life Cycle / Test: There are two life cycles, the Waterfall and the V Waterfall. Project 1 and 4 use the Waterfall life cycle. Project 1 and 4 also have separate integration and system test. Project 2 and 3 use the V Waterfall life cycle. Project 2 and 3 also combine their integration and system test.
Sampling Factor Values: Waterfall / Separate Testing (Life Cycle / Test): Use the Waterfall Life cycle. There is separate testing for integration and system test. V Waterfall / Combined Testing (Life Cycle / Test): Use the V Waterfall Life Cycle. Integration and system test is combined.
Subgroups: Waterfall / Separate Testing: Use the Waterfall Life cycle. There is separate testing for integration and system test.
8 People, 2 Basic Units
– Waterfall / Separate TestingV Waterfall / Combined Testing: Use the V Waterfall Life Cycle. Integration and system test is combined.
8 People, 2 Basic Units
– V Waterfall / Combined Testing