JIANG SU XING HU TECHNOLOGY CO.,LTD-2020-CMMI3

CMMI认证查询 cmmirz 3个月前 (06-28) 7次浏览 0个评论
Organization Name:
(组织名称)
JIANG SU XING HU TECHNOLOGY CO.,LTD
Organizational Unit:
(组织单位)
Software Development Department
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Jun 29, 2020
Lead Appraiser:
(主任评估师)
Dixie Dice
Sponsor:
(发起人)
Wancheng You
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All development work is conducted in the Nanjing offices.)

Customer (Not Relevant: One project is a petrochemical industry customer, three projects have a fire industry customer, one project has a community customer. There are not changes in the process based on customer.)

Size (Not Relevant: All projects are between 5 and 8 man-months and have 4 people. The size difference is minimal and does not affect the way the projects implement the processes. The duration of the projects are 5-6 months. The range is not significant in how the projects perform the processes.)

Organizational Structure (Not Relevant: All projects come from Software Development Department.)

Type of Work (Not Relevant: All projects are software development of products using full range of appropriate organizations processes.)

Life Cycle / Test: There are two life cycles, the Waterfall and the V Waterfall. Project 1 and 4 use the Waterfall life cycle. Project 1 and 4 also have separate integration and system test. Project 2 and 3 use the V Waterfall life cycle. Project 2 and 3 also combine their integration and system test.

Sampling Factor Values: Waterfall / Separate Testing (Life Cycle / Test): Use the Waterfall Life cycle. There is separate testing for integration and system test.

V Waterfall / Combined Testing (Life Cycle / Test): Use the V Waterfall Life Cycle. Integration and system test is combined.

Subgroups: Waterfall / Separate Testing: Use the Waterfall Life cycle. There is separate testing for integration and system test.
8 People, 2 Basic Units
– Waterfall / Separate Testing

V Waterfall / Combined Testing: Use the V Waterfall Life Cycle. Integration and system test is combined.
8 People, 2 Basic Units
– V Waterfall / Combined Testing


版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:JIANG SU XING HU TECHNOLOGY CO.,LTD-2020-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址