Larsen & Toubro Limited-2019-CMMI5

CMMI认证查询 cmmirz 1年前 (2019-02-13) 74次浏览 0个评论
Organization Name:
(组织名称)
Larsen & Toubro Limited
Organizational Unit:
(组织单位)
Product & Technology Development Center and Design Engineering Center within L&T Defence
Maturity Level:
(成熟度)
Maturity Level 5
Appraisal End Date:
(评估结束日期)
Feb 14, 2019
Lead Appraiser:
(主任评估师)
Mangesh Katalkar
Sponsor:
(发起人)
Harshan Budke
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: One location i.e. Mumbai – This has no bearing on process execution.)
Customer (Not Relevant: Standard processes defined at organization level are uniformly implemented across every customer in order to ensure consistent outcome in quality and customer experience.)
Size (Not Relevant: Projects are of size that ranges from 8 to 11 persons and their complexities are manageable due to the processes are common.)
Organizational Structure: Product & Technology Development Center (PTDC) and Design Engineering Center (DEC) are depicted on an organization chart. Projects come from two different centers within L&T Defence IC of Larsen & Toubro Limited. Process areas affected are Project Management and Engineering process areas.
Type of Work: Work is performed differently based the type of work i.e. Integrated System Development Projects, Electronic System Development Projects, Mechanical System Development Projects. Process areas affected are Engineering process areas.
Sampling Factor Values: Product & Technology Development Center (Organizational Structure): Product & Technology Development Center (PTDC)
Design Engineering Center (Organizational Structure): Design Engineering Center (DEC)
Integrated System Development Projects (Type of Work): Design projects which result in the development of systems consisting of mechanical and electronic elements.
Electronic System Development Projects (Type of Work): Design projects which result in the development of systems consisting of electronic elements.
Mechanical System Development Projects (Type of Work): Design projects which result in the development of systems consisting of mechanical elements.
Subgroups: SG1: Integrated System Development Projects executed from Product & Technology Development Center
27 People, 5 Basic Units
– Product & Technology Development Center
– Integrated System Development Projects
SG2: Electronic System Development Projects executed from Product & Technology Development Center
11 People, 2 Basic Units
– Electronic System Development Projects
– Product & Technology Development Center
SG3: Mechanical System Development Projects executed from Design Engineering Center
9 People, 2 Basic Units
– Design Engineering Center
– Mechanical System Development Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权