Sears IT & Management Services India Pvt. Ltd.-2016-CMMI3

CMMI认证查询 cmmirz 11年前 (2016-02-08) 892次浏览 0个评论
Organization Name:
(组织名称)
Sears IT & Management Services India Pvt. Ltd.
Organizational Unit:
(组织单位)
Member Technology
Maturity Level:
(成熟度)
Maturity Level 3
Appraisal End Date:
(评估结束日期)
Feb 09, 2016
Lead Appraiser:
(主任评估师)
Shrikant Brahme
Sponsor:
(发起人)
Alok Kumar
Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The scope of appraisal is only Pune location)
Customer (Not Relevant: The QMS processes are established at organizational level and processes are not differentiating with customer.)
Size (Not Relevant: The QMS processes does not vary and different for different size of the projects.)
Organizational Structure (Not Relevant: There is one major division “Member Technology” QMS processes are implemented across projects. So this factor is not impacting for the project selection. Following functions/activities are carried out at organizational Level. # Quality Management Group (QMG) which includes -Software Engineering Process Group (SEPG) & -Software Quality Assurance (SQA) # Sears Technical & Management Academy (OT))
Type of Work (Not Relevant: Software development work is considered in scope of appraisal. QMS processes are followed for all projects and hence not applicable for sampling.)
Lifecycle: Projects are executed using Waterfall, Agile & Waterfall-QMS Lite life cycles. Separate processes are defined for all lifecycles. Since sets of processes are different for waterfall, Agile & waterfall-QMS lite, this factor is considered for the sampling factor.
Sampling Factor Values: Waterfall (Lifecycle): This is the most common and classic of life cycle models, also referred to as a linear sequential life cycle. In “The Waterfall” approach, the whole process of software development is divided into separate process phases. The phases in Waterfall model are: Requirements Analysis, Software Design, Coding and Testing & Maintenance. In a waterfall model, each phase must be completed in its entirety before the next phase can begin.
Agile (Lifecycle): Agile methods break tasks into small increments with minimal planning, and do not directly involve long-term planning. Iterations are short time frames (time boxes) that typically last from one to four weeks. Each iteration involves a team working through a full software development cycle including planning, requirements analysis, design, coding, unit testing, and acceptance testing when a working product is demonstrated to stakeholders. Multiple iterations may be required to release a product o
Waterfall-QMS lite (Lifecycle): Conceptually similar to Waterfall Life Cycle with difference of granularity at which processes/process steps are followed. In “The Waterfall- QMS Lite” approach, the whole process of software development is combined into different process phases. The phases in Waterfall QMS Lite model are: Requirements Analysis, Software Design, Coding and Testing & Maintenance.
Subgroups: Waterfall: This is the most common and classic of life cycle models, also referred to as a linear sequential life cycle. In “The Waterfall” approach, the whole process of software development is divided into separate process phases. The phases in Waterfall model are: Requirements Analysis, Software Design, Coding and Testing & Maintenance. In a waterfall model, each phase must be completed in its entirety before the next phase can begin.
19 People, 4 Basic Units
– Waterfall
Agile: Agile methods break tasks into small increments with minimal planning, and do not directly involve long-term planning. Iterations are short time frames (time boxes) that typically last from one to four weeks. Each iteration involves a team working through a full software development cycle including planning, requirements analysis, design, coding, unit testing, and acceptance testing when a working product is demonstrated to stakeholders.
14 People, 1 Basic Units
– Agile
Waterfall-QMS lite: . In “The Waterfall- QMS Lite” approach, the whole process of software development is combined into different process phases. The phases in Waterfall QMS Lite model are: Requirements Analysis, Software Design, Coding and Testing & Maintenance.
4 People, 2 Basic Units
– Waterfall-QMS lite

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Sears IT & Management Services India Pvt. Ltd.-2016-CMMI3
喜欢 (0)
发表我的评论
取消评论

表情 贴图 加粗 删除线 居中 斜体 签到

Hi,您需要填写昵称和邮箱!

  • 昵称 (必填)
  • 邮箱 (必填)
  • 网址