(组织名称) Xi’an EMB Electrical Engineering Co., Ltd.
(组织单位) Technical Center
(成熟度) Maturity Level 3
(评估结束日期) May 29, 2020
(主任评估师) Deepak Manjarekar
(发起人) yan liu
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: The scope of appraisal is Technical Center of Xi’an EMB located at Xi’an. No other location is considered. Xi’an EMB QMS processes are established at organizational level for Xi’an Location.
So ‘LOCATION’ factor is not considered for project selection.)Customer (Not Relevant: Technical Center executes customized software development projects for clients related to power transmission, power control and power measurement. In all the basic units, standard process defined at organization level with minor tailoring is followed. No significant changes observed in the processes followed by these projects for different customers.
So ‘CUSTOMER’ factor is not considered for project selection.)Size (Not Relevant: Technical Center QMS processes does not vary and differentiating for different size of the projects. All projects are of typically similar staff size (07-08 staff) with similar duration. There is no variation in the work performed in these projects due to project team size and hence all projects are required to follow same processes irrespective of project team size.
So ‘SIZE’ factor is not considered for project selection.)Organizational Structure (Not Relevant: Organizational Structure is same for all the software development projects executed in Technical Center hence no significant process variation based on organizational structure.
So ‘ORGANIZATIONAL STRUCTURE’ factor is not considered for the project selection.
Following functions / activities are carried out at organizational Level.
1. EPG
2. Testing
3. PPQA
4. Training)Type of Work (Not Relevant: Technical Center executes software development projects using the Waterfall Life Cycle. Same sets of processes are followed for execution of these projects.
So ‘TYPE OF WORK’ factor is not considered for project selection.)Life Cycle: All Projects follow Waterfall Life Cycle. Though Life Cycle factor does not have any impact, ‘LIFE CYCLE’ factor is considered for project selection.
Sampling Factor Values: Waterfall Life Cycle (Life Cycle): Projects which follows Waterfall life cycle for project execution No Life Cycle (Life Cycle): –
Subgroups: Waterfall Life Cycle: Projects which follows Waterfall life cycle for project execution
14 People, 2 Basic Units
– Waterfall Life Cycle